I have a headache of a final for a new construction appraisal. The last 1004D found the subject incomplete due to a microwave/hood fan sitting in the garage instead of above the range, a plain bare bulb fixture in the DR and a light fixture sitting on the floor, a gas fire log sitting half assembled in the FP and a couple other small items. The driveway asphalt and final grading and seeding were not complete which is typical for late winter.
Nothing was found that was required for a C of O. All this was explained in the 1004D which was apparently accepted by all for a few weeks.
I then got an order a couple weeks ago for the final final and was told to call the borrower as they were now living in the home. The problem was that, when I called him, he told me he had a dispute with the builder regarding the final grading and quality of the paving and would not allow me in until the builder had resolved the problem. He admitted that he was using my final as leverage to get what he wanted from the builder. So things have gone back and forth between the AMC, the bank and the builder for a couple weeks. I basically told them to call me when the borrower was ready to allow me on to the property.
So today I got a call from a person at the AMC who, apparently unaware of the items to be completed inside, had called to ask if I could drive by and say if the grading, seeding and asphalt had been completed. After making him aware of these items he sighed and said he was going to go back to the lender, but speculated that they may have signed off on the interior items.
My problem is that all items are typically required to be completed in a "workmanlike" manner. If somehow they were able to send me something attesting to the interior items being completed in their view, I wonder if I could reliably attest that the exterior items are properly completed based solely from the public street. I worry as the borrower already is complaining that it was not done properly and the last thing I need is to get drawn into some stupid lawsuit between him and the builder.
Any ideas?
Nothing was found that was required for a C of O. All this was explained in the 1004D which was apparently accepted by all for a few weeks.
I then got an order a couple weeks ago for the final final and was told to call the borrower as they were now living in the home. The problem was that, when I called him, he told me he had a dispute with the builder regarding the final grading and quality of the paving and would not allow me in until the builder had resolved the problem. He admitted that he was using my final as leverage to get what he wanted from the builder. So things have gone back and forth between the AMC, the bank and the builder for a couple weeks. I basically told them to call me when the borrower was ready to allow me on to the property.
So today I got a call from a person at the AMC who, apparently unaware of the items to be completed inside, had called to ask if I could drive by and say if the grading, seeding and asphalt had been completed. After making him aware of these items he sighed and said he was going to go back to the lender, but speculated that they may have signed off on the interior items.
My problem is that all items are typically required to be completed in a "workmanlike" manner. If somehow they were able to send me something attesting to the interior items being completed in their view, I wonder if I could reliably attest that the exterior items are properly completed based solely from the public street. I worry as the borrower already is complaining that it was not done properly and the last thing I need is to get drawn into some stupid lawsuit between him and the builder.
Any ideas?