Grok: Michigan is a surplus-airspace market, so the comps look nothing like coastal California. Statewide remaining life is about 23 years on FY 2025 throughput, imported waste is still coming in because the state surcharge is only $0.36 a ton, and a permitted site is valuable mainly if it sits on the Detroit haul and still has years left.
EGLE’s FY 2025 report is the capacity set. Total disposal was 22.6 million tons, down 6.35 percent from FY 2024. Of that, about 18.5 million tons was Michigan waste, 3.2 million came from Canada, and 0.9 million from other states. Remaining airspace on the sites that matter:
| Landfill | County | Operator | Remaining airspace | Years left (EGLE calc / reported) |
|---|
| Carleton Farms | Wayne | Republic | 69.6 million cy | 37 / 38 |
| Autumn Hills | Ottawa | WM | 19.3 million cy | 32 / 25 |
| Granger Wood Street | Clinton | Granger | 16.7 million cy | 35 / 34 |
| Brent Run | Genesee | GFL | 11.3 million cy | 29 / 12 |
| Arbor Hills | Washtenaw | GFL | 7.2 million cy | 4 / 6 |
| Citizens Disposal | Genesee | GFL | 4.2 million cy | 10 / 10 |
| Eagle Valley | Oakland | WM | 4.8 million cy | 6 / 7 |
Arbor Hills is the scarce one. It took about 1.88 million tons in 2025, the fourth-largest volume in the state, and GFL is already asking Washtenaw County to put a north expansion into the materials-management plan. That expansion is pitched at as much as 50 years. Carleton Farms, 664 acres at 28800 Clark Road in Sumpter Township, is the long-life opposite: Republic, license through March 2028, and a June 2024 closure and post-closure cost estimate of $67.8 million against a perpetual-care fund balance of about $40.3 million as of October 2025.
Gate-rate comps are thin because operators do not publish contract prices. Compiled 2024–2026 ranges put Michigan municipal solid waste around $32–$58 a ton, with a midpoint near $45 and a small verified sample averaging about $61. The only hard published increase is Marquette County, which went to $87 a ton on July 1, 2025, to pay for a PFAS leachate plant required by an EGLE consent order. The state surcharge is still $0.36 a ton. Whitmer’s FY 2026 budget proposed $5, against a Great Lakes average around $5.25. That $5 would be a small slice of the gate fee, not a change in the asset.