DonRico
Senior Member
- Joined
- Nov 26, 2002
- Professional Status
- Certified General Appraiser
- State
- South Carolina
Does the VA require an actual CAD Sketch ? Or is scanning in the Builder's Brochure enough for New Construction ?
I always measure the Perimeter on site and if there is no change to the footprint of this Model, like a bump-out Kitchen or such -- I've just scanned in the Brochure showing room placement. Always been sufficient before. Trying to save a step here.
Is there a written VA requirement that I do my own CAD Sketch in the Report ?
I always measure the Perimeter on site and if there is no change to the footprint of this Model, like a bump-out Kitchen or such -- I've just scanned in the Brochure showing room placement. Always been sufficient before. Trying to save a step here.
Is there a written VA requirement that I do my own CAD Sketch in the Report ?