I did a few Hybrids 4 or 5 yrs back, all for a mega-Bank. The pay was perhaps a bit more than 1/2 a typical 1004, yet as much or more work, because of the learning curve for the new format/software needed. Ended up doing 3 or 4 of these nightmares only; because on 1, just from common sense and also simple math the basement was disproportionally smaller than the 1st level, which was physically impossible. As I pointed this out to the Reviewer, that the data collector either did not measure the property correctly, and/or the auto-measuring software did not work correctly...basically that was the last Hybrid they ever gave me and that I would ever do again.